Due to the importance of both the gas system and the safety of this system for the Laboratory, it is necessary for the LSC to review and supervise it. A panel of experts from various institutions met to review the NEXT-NEW experiment gas system from February 8 to 10 at the Laboratory’s facilities. At this meeting, the NEXT collaboration made a presentation to the Committee, which, after seeing the installed system in situ, will prepare a report on it.